Units with fans on top.
Services: Industrial Projects



Chiller Installation –
Completed the installation of a 2000 ton chiller, associated piping and piping for a future chiller in the powerhouse.

Freon System-
Completed the installation of a Freon charging system which included a storage tank, piping and pumping system.

Box Modification-
This was a design / build project which included the design for spray on bed liners. The systems designed were process steam, high pressure spray test water, parts, washers and dryers.

Welder Water Upgrade- Installed four 200 HP pumps, rework of the existing plant piping mains and frame and plate heat exchangers.

All of the GM projects were completed by the deadline, even when some deadlines were as little as fourteen days. The projects each provided unique challenges and solutions requiring all key players to work closely together.

Shim




This was a design / build project which included the design of the following systems: high pressure spray water leak test; drain; pumping; and dry-off oven. The piping for the systems was prefabricated, and the project was guaranteed to the owner.